老熟女重囗味hdxx70星空,中国丰满少妇人妻XXX性董鑫洁,娇妻互换被高潮了三次,国产精品看高国产精品不卡

中文
Projects
Testing Project of the East-West Expressway in Algeria

The East-West Expressway in Algeria is 1216 kilometers long with six lanes in both directions and is the main traffic artery running through the east-west direction of Algeria. 


Back

Main work undertaken

JSTI conducted testing technical consulting, data control, and inspection and measurement for the entire engineering project by establishing and operating the central laboratory of the general contractor, improving the overall quality control level.


Achievements

Won the 15th China Civil Engineering Zhan Tianyou Award.